VAS will install the first batch atmosphere furnace line in the UK since 2006

VAS will install the first batch atmosphere furnace line in the UK since 2006. The new Ipsen T furnace, is totally water free and with the new HYBRIDCARB generator built in to reduce footprint. The new HYBRIDCARB replaces the old gas generators, resulting in operational savings of up to 98%. The furnaces will be equipped with the latest version of Carbo-prof.

VAS will install and commission the 2 ‘T’ furnaces, temperer, washer and loading equipment at Meltham Thermal Engineers (MTE). Provision is already been made for an additional T furnace in the future.